Implemented projects 2014

      

Lithuania, Akmenė
Installation of the condensing economizer for gas-fired boilers (2 x 2,0 MW) 

Lithuania, Kaunas
Construction of the biofuel boiler house (2 x 8 MW) with condensing economizer 

Lithuania, Klaipėda
Construction of the biofuel boiler (
1 x 26 t/h) house with condensing economizer

Lithuania, Pakruojis
Construction of the biofuel boiler house (1 x 4,0 MW) with condensing economizer

 

Lithuania, Plungė
Construction of the biofuel boiler house (1 x 5,0 MW) with condensing economizer

Lithuania, Lentvaris
Construction of the biofuel boiler house (1 x 4,95 MW) with condensing economizer 

                   

Lithuania, Plungė
Installation of heat supply pipelines                           

Lithuania, Pakruojis
Installation of heat supply pipelines